The first job of the build is actually to remove parts rather than add them, namely the interior aluminium panels.
There are 5 panels in total to remove: the rear bulkhead, 2x bow-tube panels and 2 x footwell panels. The rear & bow tube panels are held in with aluminium rivets and the footwell panels use stainless steel rivets along the bottom edge and aluminium along the top edge. The stainless steel rivets also serve to fasten the lowered floor pans to the lower chassis tube.
I’ve obtained black aluminium and black stainless rivets for the replacement carbon panels.
Removing the old panels is relatively easy for the most part, just drilling out the centres and then tapping off the rivet head with an old chisel. The most difficult parts are in the footwells simply because access is so restricted. A cordless angle drill and camping lantern proved very helpful during this part.
Once the rivets are out of the way the panels can be removed. This involves a little bit of flexing and twisting of each panel but is not too difficult.
The rear panel was the trickiest as the two bow tube panels have to be removed first along with 3 rivets in each of the outer chassis tubes. The rear panel is also held in by the tunnel panels and I had to bend the flanges on the tunnel panels slightly to get enough clearance.
Once the panels were all removed I went round every hole with a pin punch to make sure all remnants of the old rivets were punched into the chassis tubes. More drilling and hammering was necessary at this stage particularly where the rivet mandrel had snapped off flush with the rivet dome.
The final job was to spray cavity wax into each hole, this serves two purposes, the first is to protect the inner chassis walls from corrosion and the second is to stick all the remains of the rivets together so they do not rattle around.
I also removed the plywood boot floor during this process and decided that a few coats of varnish would do no harm especially as the underside of the panel is somewhat exposed to the elements.
I will leave fitting the replacement panels until later in the build but the first major job is now done.